5 YEARS OF R&D — PROVEN RELIABILITY

Field-proven

Not a concept. Already operating.

SkimBoat does not start from a blank page. It comes from ENKI R&D and multi-season public operations through Exocetgame boats — validated under real uptime constraints, staff rotation and guest behavior.

2018 →
R&D start
2023–2025
Public ops
8,000+
Users
2,500+
Hours

Real guests · seasonal staff · repeated cycles · maintenance & safety constraints

Field operation hero

What “field-proven” means

These are not showroom conditions. It’s public operation: fast onboarding, repeat sessions, supervision, battery routines, and real guest behavior — every day.

Ops photo 1
Ops photo 2
Ops photo 3
Collective project

A proven partner ecosystem

SkimBoat is built with a long-term partner ecosystem working together for more than five years — validated under real-world operation constraints.

5+ years collaboration Propulsion • Electronics • Naval architecture Validated in public ops
SMVE Performance logo

SMVE Performance

Electric motor design & manufacturing

“Motor architecture validated in public operation.”

Propulsion
ENAV Systems logo

ENAV Systems

Marine electric systems integration

“Integration tested with real operators and guests.”

Integration
E-Pulse logo

E-Pulse

Industrial propulsion program (architecture & convergence)

“Convergence validated before pre-series industrialization.”

Industrialization
COBO France logo

COBO France

Embedded electronics, control & supervision

“Electronics validated under supervision and safety constraints.”

Electronics
Charles Bertrand logo

Charles Bertrand

Naval architecture & hull design

“Hull behavior confirmed in real operating conditions.”

Naval architect
EBG Composite logo

EBG Composite

Composite manufacturing & industrialization

“Manufacturing constraints validated before pre-series.”

Manufacturing

Institutional validation: Laureate of the “Avenir Littoral” program — Région Occitanie (France).

How SkimBoat was validated through Exocetgame

SkimBoat exists today through Exocetgame public operations. Boats, motors and foils were validated in real conditions before being unified into a standalone product.

2023 · Phase 1

First electric POD architecture

4boats
4motors
4foils
~500hops
2024 · Phase 2

Fixed foil & hull redesign

6motor it.
6foils
~800hops
1,500users
2024–2025 · Phase 3

Architecture convergence

10+motors
v5.4motor
~1,200hops
2,500users
2025 · Phase 4

Final Exocetgame validation

10+boats
15+motors
8foils
4,500users

Visual proof (swap with your best assets)

Keep this section image-heavy. Replace with: WAMPARK, Gruissan, close-ups, charging routine, supervision, guests.

Gallery 1
Gallery 2
Gallery 3
Gallery 4
Gallery 5
Status

All critical subsystems are validated in public operation. SkimBoat is the industrial unification of these assets.

What we seek

An industrial partner to assemble a first SkimBoat pre-series and lock design-for-manufacturing.

This is an industrial discussion — not a concept review.

Status visual